Snake River Salmon Recovery Board Lead Entity
The Snake River Lead Entity is represented by the Snake River Salmon Recovery Board and is the only “lead entity” in the Snake River Salmon Recovery Region. The Lead Entity is supported by a regional technical team (RTT) and a Lead Entity Committee made up of both technical members and citizen members. The Lead Entity Committee produces a project list for consideration and final prioritization by the Snake River Salmon Recovery Board (Lead Entity).
Grant Round Documents
- Washington State Recreation and Conservation Office Manual 18
- 2021 Project Score Card for SRSRB LE
- Five Year Provisional Habitat Restoration Work Plan
- 2020 SRSRB Funding Booklet
- 2021 SRSRB Grant Round Calendar
Application Materials for Project Sponsors
SRSRB Application
SRFB Project Proposals
Starting in 2020, SRFB will no longer use Salmon Project Proposals (also known as Appendix C). The local application process still requires the SRSRB application listed in the section above. This document will be used by SRSRB to initiate your project in the Salmon Recovery Portal (previously known as Habitat Work Schedule) to then start an application in PRISM. Once notified of the PRISM project number, you will then work with SRSRB staff to complete the application questions directly in PRISM.
Additional SRFB Forms (from RCO Manual 18)
- Cost Estimate Spreadsheet (Required)
- SRFB Authorization Resolution (Required)
- RCO Fiscal Data Collection Sheet (Required)
- Barrier Information Forms
- Landowner Acknowledgement Form
- Project Partner Contribution Form
Project Checklists
Additional Grant Application Material and Information (RCO)
Permit Information and Forms
- Governor’s Office for Regulatory Innovation and Assistance
- Limit 8 Self-Certification of Proposed Habitat Restoration Activity (NMFS ESA Compliance)
Managing your SRFB Grant Appendices and Forms
Appendix L: Land Ownership and Stewardship Forms
Lead Entity Committee Materials
Partial Draft Applications
Click on each title to access packet.
- Coppei Creek C-7 Design
- Touchet River MS 1 Design
- Touchet River MS 9 Design
- Mill Creek RM 1.75 Design
- Walla Walla River RM 35.5 Restoration
- Touchet River MS 10 Restoration
- Touchet River MS 15 Design
- Tumalum Creek PALs
- Cougar Creek Fish Passage Restoration
- Mill Creek Gose Street Passage Design
- Touchet River Smolt Trap Monitoring
Draft Proposals
Draft Applications Summary Packethttps://snakeriverboard.org/wp-content/uploads/2021/03/2021-Grant-Round-Draft-Application-Summary-Reduced-2.pdf
Click on each title to access detailed project information. Information in applications is current as of March 3rd Application Deadline
- Coppei Creek C-7 Design
- Touchet River MS 1 Design
- Touchet River MS 9 Design
- Mill Creek RM 1.75 Design
- Walla Walla River RM 35.5 Restoration
- Touchet River MS 10 Design
- Touchet River MS 15 Design
- Tumalum Creek PALs
- Cougar Creek Fish Passage Restoration
- Mill Creek Gose Street Passage Design
- Touchet River Smolt Trap Monitoring
Project Tour –
Virtual Site Tours will not be pre-recorded this year. Virtual presentations will be given May 4th and 5th. We are recommending limited participation of just project sponsors SRSRB staff, SRFB Review Panel Members and RCO Grant Manager to best utilize limited time with review panel in this virtual format.
Final Proposals
June 23rd Final Scoring Meeting Agenda
Final Applications Summary Packet
Complete Final Application Packets
- Cougar Creek Fish Passage Restoration
- Touchet River Smolt Trap Monitoring
- Mill Creek Gose Street Passage Design
- Touchet River MS 10 Design
- Touchet River MS 15 Design
- Tumalum Creek PALs
- Walla Walla River RM 35.5 Restoration
- Coppei Creek C-7 Design
- Touchet River MS 1 Design
- Touchet River MS 9 Design
- Mill Creek RM 1.75 Design