Snake River Salmon Recovery Board Lead Entity

The Snake River Lead Entity is represented by the Snake River Salmon Recovery Board and is the only “lead entity” in the Snake River Salmon Recovery Region.  The Lead Entity is supported by a regional technical team (RTT)  and a Lead Entity Committee made up of both technical members and citizen members.  The Lead Entity Committee produces a project list for consideration and final prioritization by the Snake River Salmon Recovery Board (Lead Entity).


Grant Round Documents


Application Materials for Project Sponsors

SRSRB Application

SRFB Project Proposals

Starting in 2020, SRFB will no longer use Salmon Project Proposals (also known as Appendix C).  The local application process still requires the SRSRB application listed in the section above.  This document will be used by SRSRB to initiate your project in the Salmon Recovery Portal (previously known as Habitat Work Schedule) to then start an application in PRISM.  Once notified of the PRISM project number, you will then work with SRSRB staff to complete the application questions directly in PRISM.

Additional SRFB Forms (from RCO Manual 18)

Project Checklists

Additional Grant Application Material and Information (RCO)

Permit Information and Forms

Managing your SRFB Grant Appendices and Forms

Appendix L: Land Ownership and Stewardship Forms

Lead Entity Committee Materials

Partial Draft Applications

Click on each title to access packet.

  1. Coppei Creek C-7 Design
  2. Touchet River MS 1 Design
  3. Touchet River MS 9 Design
  4. Mill Creek RM 1.75 Design
  5. Walla Walla River RM 35.5 Restoration
  6. Touchet River MS 10 Restoration
  7. Touchet River MS 15 Design
  8. Tumalum Creek PALs
  9. Cougar Creek Fish Passage Restoration 
  10. Mill Creek Gose Street Passage Design
  11. Touchet River Smolt Trap Monitoring

 Draft Proposals

Draft Applications Summary Packethttps://snakeriverboard.org/wp-content/uploads/2021/03/2021-Grant-Round-Draft-Application-Summary-Reduced-2.pdf

Click on each title to access detailed project information. Information in applications is current as of March 3rd Application Deadline

  1. Coppei Creek C-7 Design
  2. Touchet River MS 1 Design
  3. Touchet River MS 9 Design
  4. Mill Creek RM 1.75 Design
  5. Walla Walla River RM 35.5 Restoration
  6. Touchet River MS 10 Design
  7. Touchet River MS 15 Design
  8. Tumalum Creek PALs
  9. Cougar Creek Fish Passage Restoration
  10. Mill Creek Gose Street Passage Design
  11. Touchet River Smolt Trap Monitoring

Project Tour –

Virtual Site Tours will not be pre-recorded this year. Virtual presentations will be given May 4th and 5th.  We are recommending limited participation of just project sponsors SRSRB staff, SRFB Review Panel Members and RCO Grant Manager to best utilize limited time with review panel in this virtual format.


Final Proposals

June 23rd Final Scoring Meeting Agenda

Final Applications Summary Packet 

Complete Final Application Packets

  1. Cougar Creek Fish Passage Restoration
  2. Touchet River Smolt Trap Monitoring
  3. Mill Creek Gose Street Passage Design
  4. Touchet River MS 10 Design
  5. Touchet River MS 15 Design
  6. Tumalum Creek PALs
  7. Walla Walla River RM 35.5 Restoration
  8. Coppei Creek C-7 Design
  9. Touchet River MS 1 Design
  10. Touchet River MS 9 Design
  11. Mill Creek RM 1.75 Design